Located at a high speed fiber crossroads including the ultra-low latency link to North America and Northern Europe data hubs
The Bilbao-Arasur campus includes three data center buildings and one administrative building, providing ample room to grow
Adjacent to a planned 135 MW solar farm delivering affordable clean energy
Diverse protected links to Edged sites in Madrid, Barcelona and Lisbon
Supermanzana 6 Plataforma Logística Arasur
Avenida Ribera Baja S/N, 01213 Rivabellosa, (Álava, Spain)
Tier 4 Final EPA Emission versus other tiers
Cooling system Coefficient of Performance (COP)
Estimated “six nines” of availability with Tier III design standards and N+1 power, UPS and cooling systems
Continuous systems monitoring and secure DCIM controls platform covering all mechanical and power systems
Traditional data center cooling consumes vast quantities of water, putting significant pressure on local resources. To address this growing issue, we use the ThermalWorks modular cooling system that supports the dense AI-driven loads that are reshaping the IT industry yet consumes no water.
Learn More About ThermalWorksSupporting 200 kW per rack
Our data center cooling systems support up to 70 kW per rack with air cooling and ultra-high densities up to 200 kW with plug and play liquid cooling integration.
Our facilities will be operationally carbon neutral. We accomplish this with a combination of utility green energy programs, solar and wind PPAs and certified carbon credits. Our mission is to transform data centers into a catalyst for sustainable development.
Learn More